Approval record: Sample run
Attach the species, fat range, inlet temperature and plate opening used in the demonstration. If automation includes auto-feed, record the loading method actually shown. Timed kg/h without those conditions is not an approval number. Frozen-block automation still needs block dimensions on the same sheet.
Site readiness
Confirm product-contact disassembly: worm, plates, knives and any bone-separation inserts. Ask how operators remove and store heavy cutting parts when recipe memory changes the set. Utilities remain three-phase supply, connected load, compressed air demand, cooling water, footprint and PLC interface. Guarded doors and interlocks are safety features to list; they are not a substitute for the plant’s lockout procedure.